Woodworking

Stone processing | VEM ECR 16/14

Spindle
VEM ECR 16/14
Client
ООО «Фирмон»
Repair time
33 days
History

We would like to make one clarification on the terms of repair. Since the spindle came to us in almost disassembled form, the time of its complete disassembly was 1 working day. If the mechanism had arrived assembled, the disassembly would have taken 3 working days.

The waiting period for components and the execution of the mech. works — 27 working days.

Problem
Wear of bearings, wear of the shaft cone, wear of seats for bearings on the shaft. Replacement of the rotary joint and the encoder was required.
Dismantling time
1 day
Disassembly time
1 day
Assembly time
5 days